Skip to content

Veloce

Made By: @rrop

Repo: https://github.com/RR-CREATOR/Veloce

PS: its still pretty empty, gonna be adding stuf soon

Day 1

Research on feasibility, ideas, premade projects, and deciding goals, along with basic planning

Goals:

  • Can print high quality
  • Core XY
  • Can print pla, petg and tpu
  • Speed >300 mm/s
  • Build volume >=25cm^3

Read up, watched many videos on how i could start with the design and building

Time: 4 hrs

Day 2

Figured out the basic design pattern i would follow, the various items i would need Did some feasibility research and figured out if my ideas would work Decided on a frame and structure, gonna figure out the tech parts of the BOM soon

  • Made design sketches, and found build plate and heatbed.
  • Also decided to use an aluminium plate bw the bed and pla support.
  • Also found rods, screws and decided on nema 17 motors.
  • Started with the BOM, although a lot of work is still to be done.

The plates are 310x310 mm, so thinking of keeping build volume around 300mm^3

Time: 8 hrs

Day 3

Worked further on my BOM

Figured out a way to prevent pla warping, but still pretty sure gonna print PETG for parts Also, found hotend and extruder. A BGM clone and a creality clone. Figured out hotend design as well, just the tech parts and psu is left. Should be able to get around 300mm/s speed. Soon gonna add the BOM. Honestly, finding parts has been supr painful. Lik srsly why are chinese stores banned in india :(. Gonna be using a boden setup, as dont really need to print flexible mats.

Time: 5 hrs (lik srsly, it took sooo long to find any good items)

Day 4

Finished my BOM, decided on all the parts I would need, and made some changes to previously selected parts so I can get about 500m/s print speed. Also made some basic design plans. Goona start cadding soon. This took way too much time.

Time: 7 hrs

Total Time: 24 hrs